Title
|
Funded by
|
Software tool for the forecasting of the electric load demand of the customers of an electricity supplier (2012)
| PPC
|
Renewable production short-term forecasting
| ADMIE
|
Transient stability analysis for CCPP Heron II
| TERNA S.A.
|
Short-Circuit and transient analysis for CCPP Korinthos
| RODAX S.A.
|
Investigation of the electrical & thermal performance of a cable connection of a wind farm to the distribution network
| ROKAS GROUP S.A.
|
Transient stability analysis for CCPP Ag. Nikolaos
| RODAX S.A.
|
Power transformers inrush current calculations for ALUMINION OF GREECE S.A.
| ALUMINION OF GREECE S.A.
|
Consulting services for the Ag. Nikolaos IPP Thermal Pοwer Plant 430 MW
| RODAX S.A.
|
Consulting services for the ALIVERI Thermal Pοwer Plant 416.95 MW
| RODAX S.A.
|
Auditing services for the cogeneration power plant of Aluminium of Greece S.A. in Ag. Nikolaos
| RODAX S.A.
|
Fault analysis and surge protection simulations for the PPC Lavrion co-generation power station
|
RODAX S.A.
|
Short-term Hydrothermal Scheduling Software Development (2004)
|
PPC
|
Simulation of the Greek Day-Ahead Electricity Market (2004)
|
PPC
|
Neural Network based Short-Term Electric Load Forecasting Software (2003)
|
PPC
|
Transmission Use of System Charges derivation in Greece (2001)
|
PPC
|
Transmission pricing of the Greek System (1999)
|
PPC
|
Optimal Use of Water Resources for Electricity Production (1996-1998)
|
GSRT-PPC
|
Integration of Wind Parks in the System of Crete (1995)
|
GSRT-PPC
|
Short-Term Load Forecasting using Fuzzy Neural Networks (1994-1996)
|
GSRT-PPC
|
Algorithm Development for Energy Control Centers (1988-1990)
|
GSRT-PPC
|
Communication Protocols for Air-Conditioners
|
OTE
|
Control and Data Acquisition for Wind Energy Converters(1994)
|
PPC-OTE-GSRT
|
Energy Saving in the Premises of Clostiria Naousis (1994)
|
Clostiria Naousis
|
Water Transport from Trichonis Lake to the Reservoir of Mornos. Design of Power Supplies (1993-1994)
|
|
Updating and Harmonization of green standards “Electrical
Installations for Buildings” according to IEC 364 and CENELEC 384
(1991-1993)
|
|
Installation of photovoltaics and energy centre of Monastery Simonos Petras, Holy Mountain, MIP, Development and commissioning
|
|
Short-Term Load Forecasting using Artificial Neural Networks (1992-1994)
|
GSRT-PPC
|
System Control of Wind Energy Converters for OTE-3P-company
|
OTE
|
Pump-station of EYDAP at Distomo, Viotia (Kifissos River), Design (1990-1993)
|
EYDAP
|
Pump-station in Aliakmon River (1989-1993)
|
|
Control of Reactive Power in the Energy Centre of PPC (1988-1990)
|
PPC
|
MDF Industry “Pindos”, Grevena. Design of installation (1986-1987)
|
|
Wind Energy Converters for OTE in Cyclades. Design and supervision (1987-1992)
|
VALOREN
|
Management of transportation System in Greek Telecommunication Organization (OTE)
|
OTE |